
Kerb and channel
Formed kerb, including curves, with mesh in the concrete bay behind it where the job needs a pavement.
Civil & subdivision
Cut and fill on a block, pads for new lots, concrete driveways, kerb and channel, footpaths, crossovers and stormwater. Statcon does not build roads. The road pavement is a separate contract.
The carriageway stays with the road contractor. Our concrete meets it at the kerb.


Concrete we pour

Formed kerb, including curves, with mesh in the concrete bay behind it where the job needs a pavement.

Jointed paths beside a road that is already there. We pour the path. We do not pour the road.

Long ground slabs and hardstand, mesh on chairs, screed rails set before the pour. This is slab work, not a road.

Pits, pipes and headwalls. Pipes bedded in gravel, cage tied, then concrete around the structure.