
Forms
Edge boards set to the levels. Penetrations sleeved. Falls run away from the house.
House slabs
Slabs for houses and outbuildings, plus the driveway and paths that sit with them. Steel on chairs. Falls away from the building. The truck comes when the prep is finished.
Driveways that are part of a subdivision are priced with the civil work. A house driveway on an existing block is this page.

Before the truck

Edge boards set to the levels. Penetrations sleeved. Falls run away from the house.

Plastic on the ground. Mesh lifted on bar chairs so it sits in the slab, not under it.

A boom pump is booked for a slab this size. The crew screeds to the forms.

Broom on driveways and traffic areas. Trowel on slabs under cover. Joints cut to the layout of the slab.





